Language

This page is an English translation of the Hungarian content. Charts, videos, code and downloadable source documents retain their original language. Original Hungarian text →

ADVANCED · BONDS AND LIQUIDITY · H12

Convexity and large yield changes: how can the duration estimate be improved?

The duration tangent is a close approximation only around the initial price. Convexity also accounts for curvature, but the improved accuracy still depends on the model’s assumptions.

By the end of this lesson

  • Interpret asymmetric price responses to rising and falling yields.
  • Compare linear, second-order and exact pricing.
  • Distinguish option-free cases from negative-convexity cases.

Recommended prior knowledge

Prior lessons help you follow this material. The order is recommended; pages can be opened freely.

Why is the price–yield relationship not a straight line?

For an option-free bond with positive fixed cash flows, price falls as yield rises, but not along a straight line. The relationship has positive convexity: an equal-sized yield fall can produce a larger price gain than the loss caused by a yield rise. Measure both directions from the same initial state. Different initial prices and cash flows do not provide a clean comparison.

Greater convexity is not free protection. It can have a market price, and comparisons with another bond may also change yield, duration, credit quality, currency and liquidity. One attractive measure cannot rank every asset. If greater curvature comes with a lower initial yield, the subsequent rate path and holding horizon also matter for total results.

[1] [2]

The second-order approximation and correct units

Modified duration relates to the first yield derivative of price, while convexity relates to the second, normalised by price. The formula uses a decimal yield change, and the convexity definition must use the same compounding convention as duration. Substituting a differently scaled measure from another source without conversion can produce an incorrect order of magnitude even when the signs are right.

With positive convexity, the squared term is a positive correction in either shock direction. It reduces the linear loss estimate when yields rise and increases the estimated gain when yields fall. This does not make the total price change necessarily positive: the negative duration term can dominate. The formula is a local expansion, so larger moves make higher-order terms and full repricing important.

ΔP / P ≈ −D_mod × Δy + 0.5 × C × (Δy)^2; C = P⁻¹ × d²P/dy²

[1]

A larger shock: improvement and remaining error

Hypothetical example: face value 100, annual coupon payment 4, maturity 10 years and annual yield 5%. On a coupon date, without options or default, exact price is 92,2783, modified duration 7,9615 and convexity 78,2942. For a +2 percentage-point yield rise, the linear price change is −15,92%, the second-order estimate −14,36% and exact repricing −14,47%. The improvement is visible; the remaining error is not zero.

From the same starting point, a −2 percentage-point yield fall gives an exact price gain of +17,61%, not simply +14,47%. This asymmetry follows from positive curvature. The model shows instantaneous repricing with unchanged cash flows, not a multi-year investment forecast. During a holding period, remaining maturity changes, coupons can arrive and reinvestment creates additional results; these require separate modelling.

[1]

When can effective convexity be negative?

After rates fall, a callable bond’s issuer may find cheaper refinancing attractive. Prepayments can also accelerate in mortgage-backed securities. Expected cash flows then change, investors’ price upside can be limited and effective convexity can turn negative in some regions. This does not refute the curvature of a bond with fixed positive cash flows: the instrument has a different set of conditions.

The annual option-free bond model below does not simulate this. Securities with options also require assumptions about rate volatility, call rules and prepayment behaviour. Changing duration means a previously matched hedge needs reassessment; one initial convexity figure does not guarantee a stable hedge. Treat model risk separately from the risk of historically observed rate movements.

[1] [2]

Rounding can also conceal curvature

Numerical convexity checks need prices calculated under equal positive and negative yield steps with sufficient internal precision. Rounding initial and shocked prices too early can erase small differences. Round displayed prices only at the final step; compare first- and second-order approximation errors using full-precision values internally.

Measure the approximation error

Compare several positive and negative shocks with exact prices and record the discrepancies. Keep initial yield, cash flows and convention fixed. Nonparallel curve shifts, spread changes or altered payments require a different framework. If approximation error is too large for the decision, use full stress repricing; a smaller formula error alone does not validate the model’s economic assumptions.

[1] [2]

Try the model

Illustrative model with hypothetical inputs. Not live market data or a forecast.

Modified duration · years7,96
Annual convexity · years²78,29
Duration approximation · %-15,92
Duration-plus-convexity approximation · %-14,36
Exact price change · %-14,47

Annual-coupon option-free bond, unchanged cash flows and a parallel yield shock. The price change is immediate, not annual total return. Approximations can differ from exact prices; real curves may move non-parallel.

How is this calculated?

What does it show?

The model above follows from the selected assumptions. It is an illustration, not an observed market result or a forecast.

Formula and rule

y = yield/100; n = round(years); CF(t) = coupon + (t = n ? 100 : 0); P = Σ[t=1…n] CF(t)/(1+y)^t; D = Σ[t=1…n] t×CF(t)/(1+y)^t / P / (1+y); dy = shock/100; C = Σ[t=1…n] t×(t+1)×CF(t)/(1+y)^(t+2)/P; linearPct = −D×shock; convexityPct = 100×(−D×dy+0.5×C×dy²); exactPct = 100×(P(y+dy)/P(y)−1)

Inputs and notation

coupon
Annual coupon · %
yield
Market yield · %
years
Maturity · years
shock
Parallel yield shock · percentage points
duration
Modified duration · years
convexity
Annual convexity · years²
linearPct
Duration approximation · %
convexityPct
Duration-plus-convexity approximation · %
exactPct
Exact price change · %

Data and original source

Hypothetical inputs entered in the fields; original methodological sources are in the page source list.

Detailed explanation and sources on this page

Horizon, observation date and refresh

There is no market observation date. The horizon and time units are those specified in the fields; results recalculate when inputs change. The fixed example below uses the initial settings.

Units

Field and result labels specify units. Percentage inputs use a scale of one hundred; /100 converts them to a fraction. A percentage-point difference × 100 gives basis points. Monetary amounts use the same currency and scale.

Fixed illustrative example

  • Annual coupon · %: 4
  • Market yield · %: 5
  • Maturity · years: 10
  • Parallel yield shock · percentage points: 2

Results

  • Bond price: 92.2783
  • Modified duration · years: 7.9615
  • Annual convexity · years²: 78.2942
  • Exact price change · %: -14.466
  • Duration approximation · %: -15.923
  • Duration-plus-convexity approximation · %: -14.3571

Interpretation and limitations

Variable names correspond to the field labels below. No weighting or investment classification threshold is added; formula constants and field bounds are assumptions of the teaching model. The original detailed explanation and its limitations remain in the text above.

Missing and revised data

An empty or invalid input has no valid result; missing data must not be replaced with zero. A ratio is undefined when its denominator is invalid. The example does not update from market releases or overwrite historical snapshots.

Full calculation index →

Check your understanding

Choose one answer per question, then check. Results stay on this page; the study checkmark is a separate personal record.

1. What does convexity add to a duration estimate?

Solution and explanation

Correct answer: A second-order curvature correction to the price–yield relationship

Convexity approximates the local departure from a straight line; it does not eliminate other risks.

2. With positive convexity, what sign does the squared correction have?

Solution and explanation

Correct answer: Nonnegative in either shock direction

The squared yield change is nonnegative; the total price change can still be negative.

3. With positive fixed cash flows and the same starting point, what do equal opposite yield shocks imply?

Solution and explanation

Correct answer: The gain from falling yields can exceed the loss from rising yields

Positive curvature creates the asymmetry when cash flows are unchanged.

4. When can negative effective convexity occur?

Solution and explanation

Correct answer: When calls or prepayments limit price upside

A rate-dependent option can change expected payments and curvature.

5. What should you do if second-order approximation error remains material for a large shock?

Solution and explanation

Correct answer: Use full repricing and review the assumptions

The approximation is local; large moves and changing cash flows need an appropriate pricing framework.

Primary sources and limitations

Source review: 2026-11-02. Examples are hypothetical; the lesson teaches concepts rather than judging current market conditions.

  1. FINRA · Duration, rate risk and convexity · 2017-03-03 ↗
  2. FINRA · Bonds and contractual risks ↗

Check the Market dashboard →

Money-flow radar →

How is this calculated?

What does it show?

Data, changes and classifications of the indicators above. The rules below explain how this view operates.

Formula and rule

score=correct answers; progress=100×unique completed lessons/total lessons

Inputs and notation

The self-check score counts correct answers, with equal weight per question. An unanswered question is not correct. Progress is the number of distinct lessons marked complete divided by the total for that path. Completion is self-reported, not an exam result.

Data and original source

The series, definitions and source dates shown on individual cards, charts and the original source list apply.

Detailed explanation and sources on this page

Horizon, observation date and refresh

The observation date and period shown on the card and chart apply. Retrieval time is not the observation date. Releases follow the source frequency and update at the next successful check.

Units

Field and result labels specify units. Percentage inputs use a scale of one hundred; /100 converts them to a fraction. A percentage-point difference × 100 gives basis points. Monetary amounts use the same currency and scale.

Fixed illustrative example

Illustrative numerical example; not current market data.

Example: 3 correct answers / 5 questions = 60%; 6 completed lessons / 24 lessons = 25%.

Interpretation and limitations

Observed data and editorial interpretation must be read separately. A classification follows the stated conditions; it does not by itself establish causality or future price direction. Further limitations in the original methodology also apply.

Missing and revised data

Zero can be an observed value; missing, delayed and failed sources are separate states. Different observation dates are not combined without a label. Incomplete evidence cannot yield a complete classification. Revisions may appear at the next live check; they do not change a historical article snapshot.

Full calculation index →