MACROECONOMICS 101 · M04
How the Fed works: reading rate decisions, the dot plot and balance-sheet policy
A Fed announcement can contain several distinct messages. Today’s decision, a conditional future path and balance-sheet changes answer different questions.
By the end of this lesson
- Distinguish the Fed’s structure from the FOMC’s decision-making role.
- Do not confuse the dot plot with a rate promise or QE with fiscal spending.
- Compare a decision with prior market expectations.
Who makes the monetary decision?
The Fed is the US central banking system; the FOMC is its monetary policy committee. It has up to 12 voting seats: up to 7 governors, the New York Fed president and 4 rotating regional presidents. Other regional presidents also participate in discussions. A participant is therefore not necessarily a voter.
Four documents, four types of information
The statement summarises the decision and assessment. The implementation note details operational settings. A press conference can clarify the reaction function, while later minutes help explain the discussion. Always identify the document and meeting being interpreted.
The target rate or range is not every household’s borrowing rate or the long government bond yield. Implementation rates and market operations guide short money-market rates. Long yields also reflect the term premium alongside expected short rates.
The dot plot is conditional, not a contract
In the SEP, participants project the economy under their own assessments of appropriate monetary policy. The dots show rate assessments; the median is the middle ordered value. It is not a committee-voted rate promise and does not specify every intervening meeting.
Hypothetical example: more persistent inflation may lead the same policymaker to judge a higher rate path appropriate. This need not be inconsistent: conditions changed. Examine the distribution of dots alongside inflation and growth assumptions, rather than one headline median.
QE and QT: why does the balance sheet change?
Under QE, the central bank buys securities, changing private-sector asset composition, reserves and financial conditions. This differs from a government transfer to a household. A purchase from a nonbank seller can increase both deposits and bank reserves, but these are distinct balance-sheet items.
QT can operate through reduced reinvestment of maturing principal; active sales are not necessary. Balance-sheet shrinkage and reserve changes need not match because other liabilities also move. QE/QT here describe tools: verify their current use in dated official decisions.
The gap between decision and expectation
Hypothetical example: markets expected a cut of 0,50 percentage points but received only 0,25. With signed changes, the surprise is −0,25 − (−0,50) = +0,25 percentage points. The action eases policy but is tighter than expected. The model calculates only this difference, not a price forecast.
Try the model
Illustrative model with hypothetical inputs. Not live market data or a forecast.
Illustrative model with hypothetical inputs. Not live market data or a forecast.
How is this calculated?
What does it show?
The model above follows from the selected assumptions. It is an illustration, not an observed market result or a forecast.
Formula and rule
surprise = actual − expectedInputs and notation
expected- Expected rate change · percentage points
actual- Announced rate change · percentage points
surprise- Rate surprise · percentage points
Data and original source
Hypothetical inputs entered in the fields; original methodological sources are in the page source list.
Detailed explanation and sources on this pageHorizon, observation date and refresh
There is no market observation date. The horizon and time units are those specified in the fields; results recalculate when inputs change. The fixed example below uses the initial settings.
Units
Field and result labels specify units. Percentage inputs use a scale of one hundred; /100 converts them to a fraction. A percentage-point difference × 100 gives basis points. Monetary amounts use the same currency and scale.
Fixed illustrative example
- Expected rate change · percentage points: -0.5
- Announced rate change · percentage points: -0.25
Results
- Rate surprise · percentage points: 0.25
Interpretation and limitations
Variable names correspond to the field labels below. No weighting or investment classification threshold is added; formula constants and field bounds are assumptions of the teaching model. The original detailed explanation and its limitations remain in the text above.
Missing and revised data
An empty or invalid input has no valid result; missing data must not be replaced with zero. A ratio is undefined when its denominator is invalid. The example does not update from market releases or overwrite historical snapshots.
Check your understanding
Choose one answer per question, then check. Results stay on this page; the study checkmark is a separate personal record.
Primary sources and limitations
Source review: 2026-11-01. Examples are hypothetical; the lesson teaches concepts rather than judging current market conditions.