Language

This page is an English translation of the Hungarian content. Charts, videos, code and downloadable source documents retain their original language. Original Hungarian text →

EXPERT · CURRENCY HEDGING AND PORTFOLIOS · P08

Which exposure does a forward hedge, and which costs remain in the portfolio?

Currency hedging transforms exchange-rate risk for a specified amount and date. Quantify the forward rate, separately paid costs and cash flows left unhedged as distinct items.

By the end of this lesson

  • Specify the target currency, hedged amount and maturity.
  • Avoid counting an interest differential already embedded in the forward twice.
  • Distinguish hedging initial principal from hedging the entire final foreign-currency value.

Recommended prior knowledge

Prior lessons help you follow this material. The order is recommended; pages can be opened freely.

Tie hedging to the future spending currency

The SEC’s international-investing bulletin explains that currency moves can increase or reduce a foreign investment’s return in the investor’s home currency. Currency risk is therefore distinct from local asset performance. A good local result alone does not ensure a positive return in the investor’s reporting currency.

First record the currency and date of the future cash need. A portfolio measured in forints and a later euro expense may imply different hedging objectives. Trading currency is not automatically the underlying economic exposure either. Displaying a price in another currency does not create a forward. Check hedged-share-class rules in product documents; a name and the currency shown on screen do not establish reduced currency risk.

[1]

What does an initial-principal forward hedge?

At inception, the model purchases a dollar asset and sells a chosen fraction of its initial dollar principal forward for forints. Initial spot S0, maturity spot S1 and contracted forward F are all quoted in HUF/USD. Hedge ratio h refers to initial dollar principal. This is one contract with unchanged notional until maturity; the model assumes no daily or monthly rehedging and no interim distributions.

The asset’s maturity value grows or shrinks with local returns, while the forward notional does not automatically follow it. A 100% initial-principal hedge therefore does not fully hedge every possible final dollar amount. Gains leave return exposure unhedged; losses can leave the original hedge larger than the remaining asset. This follows from fixing an amount before the investment result becomes known, not from a formula error.

R_HUF = ((1 + r) × S1 + h × (F − S1)) / S0 − 1 − h × k

Hedged and unhedged results under matching assumptions

Hypothetical example: dollar-asset return +8%, S0 = 350, S1 = 330, F = 345 HUF/USD. The separately charged hedging cost on full initial principal is k = 0,2%, and the hedge ratio is 100%. Without hedging, return is 1,08 × 330 / 350 − 1 ≈ +1,83%. The contracted forward exceeds maturity spot here, so hedging initial dollar principal adds a positive difference. These are not current quotations.

The hedged result is (1,08 × 330 + 345 − 330) / 350 − 1 − 0,002 ≈ +5,91%. Partial hedging deducts h times the full cost, an explicit model assumption rather than a universal fee rule. Both cases use the same dollar return, horizon and spot path. With the opposite currency move, hedging can reduce the unhedged result; the example does not establish a general return advantage from hedging.

Forward points and fees are separate items

The BIS discussion of covered interest parity links the spot-forward difference to interest differentials in the ideal case. A market basis can create deviations. A forward rate is therefore neither today’s spot locked in for free nor a pure forecast of the future exchange rate.

If a calculator already uses an explicit forward rate F, do not deduct its embedded interest differential again. Input k is exclusively a separate additional cost. State whether it represents a trading spread, management fee or another charge, with its base and period. The model uses a period cost: an annual fee needs an appropriate time-scaling assumption. Transparent accounting includes each item exactly once.

[2]

Residual exposure and the price of hedging

With a 100% initial hedge, currency effects on initial dollar principal cancel, but earned dollar returns convert at final spot. A policy that periodically tracks the full asset value produces different cash flows and results. When comparing two hedged products, match rebalancing frequency and targeted notional as well. “Hedged” does not identify one universal return formula.

The BIS working paper finds that hedging demand and intermediaries’ balance-sheet constraints can influence forward pricing. Hedge availability and pricing therefore depend on market conditions. In your own plan, separately inspect renewal dates, quoted spreads, counterparty risk and contractual collateral rules; the terminal-return formula does not simulate them.

[3]

Compare under matching conditions

Use the same initial wealth for unhedged, partially hedged and initially fully hedged cases. Keep local asset return, period and final spot fixed. Then vary local return and currency separately: inspect residual exposure under positive, zero and negative asset returns. Holding other inputs fixed reveals the effect of a single variable.

Record the objective in advance: matching a spending currency, moderating short-term fluctuations or hedging a specific liability. A fortunate subsequent exchange rate alone does not validate the strategy. The model neither selects an optimal hedge ratio nor forecasts exchange rates; it calculates given assumptions. Other asset risks and contractual cash flows also belong in an actual decision.

Try the model

Illustrative model with hypothetical inputs. Not live market data or a forecast.

Unhedged period return · %1,83
Hedged model period return · %5,91
Forward settlement contribution · percentage points4,29
Deduction scaled by hedge ratio · percentage points0,20

One period, static forward sale of initial foreign principal, without interim distributions or rebalancing. Separate full-hedge cost scales with the hedge ratio; the forward price may already embed interest differentials, which are not deducted again. FX exposure on the foreign return can remain. Figures are hypothetical, not executable quotes.

How is this calculated?

What does it show?

The model above follows from the selected assumptions. It is an illustration, not an observed market result or a forecast.

Formula and rule

h=hedge/100; unhedgedReturn=100×((1+foreign/100)×finalSpot/initialSpot−1); forwardContribution=100×h×(forward−finalSpot)/initialSpot; hedgeCost=h×cost; hedgedReturn=unhedgedReturn+forwardContribution−hedgeCost

Inputs and notation

foreign
Foreign asset period total return · %
initialSpot
Initial spot HUF/USD
finalSpot
Period-end spot HUF/USD
forward
Pre-agreed forward HUF/USD
hedge
Hedged share of initial foreign principal · %
cost
Separate cost for full hedge · % of initial wealth
unhedgedReturn
Unhedged period return · %
hedgedReturn
Hedged model period return · %
forwardContribution
Forward settlement contribution · percentage points
hedgeCost
Deduction scaled by hedge ratio · percentage points

Data and original source

Hypothetical inputs entered in the fields; original methodological sources are in the page source list.

Detailed explanation and sources on this page

Horizon, observation date and refresh

There is no market observation date. The horizon and time units are those specified in the fields; results recalculate when inputs change. The fixed example below uses the initial settings.

Units

Field and result labels specify units. Percentage inputs use a scale of one hundred; /100 converts them to a fraction. A percentage-point difference × 100 gives basis points. Monetary amounts use the same currency and scale.

Fixed illustrative example

  • Foreign asset period total return · %: 8
  • Initial spot HUF/USD: 350
  • Period-end spot HUF/USD: 330
  • Pre-agreed forward HUF/USD: 345
  • Hedged share of initial foreign principal · %: 100
  • Separate cost for full hedge · % of initial wealth: 0.2

Results

  • Unhedged period return · %: 1.8286
  • Hedged model period return · %: 5.9143
  • Forward settlement contribution · percentage points: 4.2857
  • Deduction scaled by hedge ratio · percentage points: 0.2

Interpretation and limitations

Variable names correspond to the field labels below. No weighting or investment classification threshold is added; formula constants and field bounds are assumptions of the teaching model. The original detailed explanation and its limitations remain in the text above.

Missing and revised data

An empty or invalid input has no valid result; missing data must not be replaced with zero. A ratio is undefined when its denominator is invalid. The example does not update from market releases or overwrite historical snapshots.

Full calculation index →

Check your understanding

Choose one answer per question, then check. Results stay on this page; the study checkmark is a separate personal record.

1. What does the model’s 100% hedge ratio cover?

Solution and explanation

Correct answer: Initial dollar principal with unchanged forward notional

The asset’s final dollar value can change while the forward contracted at inception has a fixed amount.

2. What is the hypothetical unhedged return with +8%, S0 = 350 and S1 = 330?

Solution and explanation

Correct answer: Approximately +1,83%

Multiply the dollar-return factor by the HUF/USD factor, then subtract initial wealth.

3. What is the hypothetical initially fully hedged result with F = 345 and a separate 0,2% cost?

Solution and explanation

Correct answer: Approximately +5,91%

Add the initial-principal forward payoff to asset value, and deduct the separate cost once.

4. What should you avoid when already using an explicit forward rate?

Solution and explanation

Correct answer: Deducting the embedded interest differential twice

The forward can already incorporate the interest differential; separate costs must be distinct from it.

5. Why can currency risk remain after fully hedging initial principal?

Solution and explanation

Correct answer: The earned local return was not part of the initial forward amount

The static forward notional follows initial principal; changing investment results can leave separate exposure.

Primary sources and limitations

Source review: 2026-11-02. Calculations are hypothetical examples, not current market data or forecasts.

  1. SEC · International investing and currency risk · 2016-12-08 ↗
  2. BIS · Covered interest parity and the currency basis · 2016-09-18 ↗
  3. BIS · Hedging demand and balance-sheet costs, WP 590 · 2016-10-27 ↗

Check the Market dashboard →

Money-flow radar →

How is this calculated?

What does it show?

Data, changes and classifications of the indicators above. The rules below explain how this view operates.

Formula and rule

score=correct answers; progress=100×unique completed lessons/total lessons

Inputs and notation

The self-check score counts correct answers, with equal weight per question. An unanswered question is not correct. Progress is the number of distinct lessons marked complete divided by the total for that path. Completion is self-reported, not an exam result.

Data and original source

The series, definitions and source dates shown on individual cards, charts and the original source list apply.

Detailed explanation and sources on this page

Horizon, observation date and refresh

The observation date and period shown on the card and chart apply. Retrieval time is not the observation date. Releases follow the source frequency and update at the next successful check.

Units

Field and result labels specify units. Percentage inputs use a scale of one hundred; /100 converts them to a fraction. A percentage-point difference × 100 gives basis points. Monetary amounts use the same currency and scale.

Fixed illustrative example

Illustrative numerical example; not current market data.

Example: 3 correct answers / 5 questions = 60%; 6 completed lessons / 24 lessons = 25%.

Interpretation and limitations

Observed data and editorial interpretation must be read separately. A classification follows the stated conditions; it does not by itself establish causality or future price direction. Further limitations in the original methodology also apply.

Missing and revised data

Zero can be an observed value; missing, delayed and failed sources are separate states. Different observation dates are not combined without a label. Incomplete evidence cannot yield a complete classification. Revisions may appear at the next live check; they do not change a historical article snapshot.

Full calculation index →